The bill
Affordable Innovation for the Grid Act
HR. 9339, 119th Congress — read as touching AI & Cloud Infrastructure.
Sponsored by
Rep. Harshbarger, Diana [R-TN-1]
ID: H001086
Follow the money
The bill
HR. 9339, 119th Congress — read as touching AI & Cloud Infrastructure.
The sponsor
Every bill has someone who introduced it. That name is where the paper trail starts.
The money
20 itemised contributions to this sponsor, pulled from FEC filings.
The alignment
This bill's text tracks the "Department of Energy and Related Commissions" section, p. 443-445 of the Mandate for Leadership.
Track this bill's progress through the legislative process
Latest Action
Motion to reconsider laid on the table Agreed to without objection.
September 14, 2026
📍 Current Status
Next: The bill will be reviewed by relevant committees who will debate, amend, and vote on it.
1. Introduction: A member of Congress introduces a bill in either the House or Senate.
2. Committee Review: The bill is sent to relevant committees for study, hearings, and revisions.
3. Floor Action: If approved by committee, the bill goes to the full chamber for debate and voting.
4. Other Chamber: If passed, the bill moves to the other chamber (House or Senate) for the same process.
5. Conference: If both chambers pass different versions, a conference committee reconciles the differences.
6. Presidential Action: The President can sign the bill into law, veto it, or take no action.
7. Became Law: If signed (or if Congress overrides a veto), the bill becomes law!
**Summary of H.R. 9339: Affordable Innovation for the Grid Act**
**1. Main Purpose & Objectives** The stated purpose of H.R. 9339 is to mandate a federal assessment of how artificial intelligence (AI) and high-performance computing (HPC) can improve the reliability, efficiency, and capacity of the nation’s bulk-power system—the interconnected grid that delivers electricity from generators to consumers. Ostensibly, this is about modernizing infrastructure through innovation. But let’s be honest: this bill isn’t really about saving the grid. It’s about politicians slapping a tech-savvy label on a feel-good study so they can claim they’re “doing something” about energy resilience while avoiding any actual hard decisions—like funding upgrades, regulating monopolies, or confronting climate change. The real objective? To generate a report that can be cited in future press releases, lobbyist meetings, and reelection ads, all while kicking the can down the road on meaningful grid reform.
**2. Key Provisions & Changes to Existing Law** The bill requires the Secretary of Energy, in consultation with FERC and the Electric Reliability Organization (ERO), to conduct a 90-day assessment of AI and HPC applications in grid operations. This includes evaluating probabilistic operating techniques, interconnection studies, current adoption levels, and barriers—technical, regulatory, cybersecurity, or operational. Within one year, the Secretary must submit a report to the House Energy and Commerce and Senate Energy and Natural Resources committees, with recommendations to overcome limitations and facilitate AI/HPC integration. Notably, the bill allocates **zero funding** for implementation, pilot programs, or enforcement. It’s a pure study mandate—an intellectual exercise with no teeth. No new regulations, no incentives, no penalties for inaction. Just homework for bureaucrats, due in a year, likely to be ignored.
**3. Affected Parties & Stakeholders** - **Department of Energy (DOE)**: Forced to divert staff and resources to produce another report nobody asked for, adding to the graveyard of ignored energy studies. - **FERC & NERC (ERO)**: Expected to consult and provide input, despite having neither the authority nor budget to act on findings. - **Utilities & Grid Operators**: May gain useful insights—but only if they’re already investing in AI/HPC. For others, this is irrelevant theater. - **Tech Vendors (AI/HPC firms)**: Stand to benefit indirectly if the report highlights opportunities, potentially juicing future sales—though no procurement mechanism exists here. - **Taxpayers**: On the hook for funding a study that will likely conclude what experts already know: AI could help the grid, but adoption is hampered by fragmented regulation, legacy systems, cybersecurity fears, and utility risk-aversion. Shocking, I know. - **Consumers**: Will see no immediate benefit. Any real improvements depend on future action—which this bill does not compel.
**4. Potential Impact & Implications** The impact will be minimal unless Congress follows up with funding, standards, or mandates—which, given its track record, is unlikely. This bill is legislative placebo: it treats the symptom (public anxiety about grid reliability) with a harmless sugar pill (a study) while ignoring the underlying disease (underinvestment, regulatory fragmentation, and climate-induced stress). In the best case, the report identifies low-hanging fruit—like using AI to speed up interconnection queues (currently a multi-year backlog)—and spurs voluntary adoption. In the more likely scenario, it joins the pile of DOE reports gathering virtual dust, cited only when politicians need to look busy. Ultimately, H.R. 9339 reveals the American approach to infrastructure innovation: prefer studies over spending, reports over regulation, and the illusion of progress over the mess of actual reform. It’s not evil—it’s just profoundly unserious. Like prescribing vitamins for a bullet wound. The patient might feel better temporarily, but they’re still bleeding out.
Rep. Harshbarger, Diana [R-TN-1]
Congress 119 • 2024 Election Cycle
No PAC contributions found
No organization contributions found
No committee contributions found
This bill has 6 cosponsors. Below are their top campaign contributors.
ID: M001225
Top Contributors
34
ID: O000177
Top Contributors
20
ID: S001216
Top Contributors
45
ID: E000300
Top Contributors
20
ID: V000138
Top Contributors
22
ID: G000568
Top Contributors
20
Hub layout: Politicians in center, donors arranged by type in rings around them.
Showing 45 nodes and 51 connections
Total contributions: $51
Showing top 19 donors by contribution amount
Which industries are materially affected by specific provisions in this bill. 4 helped.
Section 2 requires the Secretary of Energy to conduct an assessment on the use of artificial intelligence and high-performance computing technologies to enhance the bulk-power system, which could lead to increased adoption and investment in AI and cloud infrastructure.
Section 2(a) mentions the assessment of artificial intelligence and high-performance computing technologies to enhance the capacity, reliable operation, and operational efficiency of the bulk-power system, which could benefit electric utilities.
Section 2(b)(1) discusses the potential for artificial intelligence and high-performance computing technologies to expedite generator and load interconnection studies, which could improve the efficiency of energy infrastructure.
Section 2(a) mentions high-performance computing technologies, which rely on advanced semiconductor hardware, and could lead to increased demand for these components.
For each industry this bill affects, here's what the sponsor (Rep. Harshbarger, Diana [R-TN-1])received from donors associated with that industry during the 2022–present cycles. Donations are not proof of intent — they are a record of who funds the people writing the law.
This bill shows semantic similarity to the following sections of the Project 2025 policy document.AI-enhanced analysis provides detailed alignment ratings.
AI Analysis:
"The bill aligns strongly with Project 2025's focus on modernizing the bulk-power system through technological innovation, particularly by assessing AI and HPC applications to improve grid reliability, efficiency, and interconnection processes—goals consistent with securing and upgrading the nation's electric infrastructure as emphasized in the cited executive order and DOE initiatives."
— 411 — Department of Energy and Related Commissions 19. President Donald J. Trump, Executive Order 13920, “Securing the United States Bulk-Power System,” May 1, 2020, in Federal Register, Vol. 85, No. 86 (May 4, 2020), pp. 26595–26599, https://www.govinfo.gov/content/ pkg/FR-2020-05-04/pdf/2020-09695.pdf (accessed February 13, 2023). 20. 18 U.S. Code § 824a(c), https://www.law.cornell.edu/uscode/text/16/824a (accessed February 27, 2023). 21. Report No. 117-98, Energy and Water Development and Related Agencies Appropriations Bill, 2022, Committee on Appropriations, U.S. House of Representatives, 117th Cong. 1st Sess., July 20, 2021, p. 6, https:// www.congress.gov/117/crpt/hrpt98/CRPT-117hrpt98.pdf (accessed February 13, 2023). 22. H.R. 3684, Infrastructure Investment and Jobs Act, Public Law No. 11-58, 117th Congress, November 15, 2021, Division J, Title III. 23. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, p. 7. 24. Timothy Gardner, “White House Asks Congress for $500 mln to Modernize Oil Reserve,” Reuters, November 16, 2022, https://www.reuters.com/article/usa-oil-spr-idAFL1N32C36I (accessed February 13, 2023). 25. U.S. Department of Energy, Office of Electricity, “Our History,” https://www.energy.gov/oe/about-us/our- history (accessed February 13, 2023). 26. Press release, “Secretary of Energy Signs Order to Mitigate Security Risks to the Nation’s Electric Grid,” U.S. Department of Energy, December 17, 2021, https://www.energy.gov/articles/secretary-energy-signs-order- mitigate-security-risks-nations-electric-grid (accessed February 13, 2023). 27. U.S. Department of Energy, Office of Electricity, “Revocation of Prohibition Order Securing Critical Defense Facilities,” Federal Register, Vol. 86, No. 76 (April 22, 2021), pp. 21308–21309, https://www.govinfo.gov/ content/pkg/FR-2021-04-22/pdf/2021-08483.pdf (accessed February 13, 2023). 28. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 19 and 61. 29. U.S. Department of Energy, Office of Nuclear Energy, “About Us,” https://www.energy.gov/ne/about-us (accessed February 13, 2023). 30. H.R. 3809, Nuclear Waste Policy Act of 1982, Public Law No. 97-425, 97th Congress, January 7, 1983, https:// www.congress.gov/97/statute/STATUTE-96/STATUTE-96-Pg2201.pdf (accessed February 24, 2023). 31. The Heritage Foundation, “Budget Blueprint for Fiscal Year 2023: Reduce the DOE Office of Nuclear Energy,” https://www.heritage.org/budget/pages/recommendations/1.270.127.html. 32. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 23 and 58. 33. 42 USC § 16291, https://www.law.cornell.edu/uscode/text/42/16291 (accessed February 27, 2023). 34. U.S. Department of Energy, Office of Fossil Energy and Carbon Management, “About Us: Mission,” https:// www.energy.gov/fecm/mission (accessed February 13, 2023). 35. U.S. Government Accountability Office, Carbon Capture and Storage: Actions Needed to Improve DOE Management of Demonstration Projects, GAO-22-105111, December2021, https://www.gao.gov/assets/gao-22- 105111.pdf (accessed February 13, 2023). 36. International Energy Agency, The Role of Critical Minerals in Clean Energy Transitions, World Energy Outlook Special Report, revised March 2022, https://iea.blob.core.windows.net/assets/ffd2a83b-8c30-4e9d-980a- 52b6d9a86fdc/TheRoleofCriticalMineralsinCleanEnergyTransitions.pdf (accessed February 13, 2023). 37. See 42 U.S. Code § 16291. 38. 42 U.S. Code Ch. 55, §§ 4321–4347, https://www.law.cornell.edu/uscode/text/42/chapter-55 (accessed February 27, 2023). 39. Nuclear Regulatory Commission, “Categorical Exclusions from Environmental Review,” Advance Notice of Proposed Rulemaking; Request for Comment, Federal Register, Vol. 86, No. 87 (May 7, 2021), pp. 24514–24516, https://www.govinfo.gov/content/pkg/FR-2021-05-07/pdf/2021-09675.pdf (accessed February 27, 2023), and Nuclear Regulatory Commission, “Categorical Exclusions from Environmental Review,” Advance Notice of Proposed Rulemaking; Reopening of Comment Period, Federal Register, Vol. 86, No. 160 (August 23, 2021), pp. 47032–47033, https://www.govinfo.gov/content/pkg/FR-2021-08-23/pdf/2021-18058.pdf (accessed February 27, 2023). 40. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 19, 21, 23, and 52. — 412 — Mandate for Leadership: The Conservative Promise 41. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 3, 6, 12, 19, 21, and 23. 42. S. 622, Energy Policy and Conservation Act, Public Law 94-163, 94th Congress, December 22, 1975, https:// www.congress.gov/94/statute/STATUTE-89/STATUTE-89-Pg871.pdf (accessed February 27, 2023). 43. H.R. 6, Energy Policy Act of 2005, Public Law No. 109-58, 109th Congress, August 8, 2005, https://www. congress.gov/109/plaws/publ58/PLAW-109publ58.pdf (accessed February 27, 2023). 44. U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, “About the Office of Energy Efficiency and Renewable Energy,” https://www.energy.gov/eere/about-office-energy-efficiency-and- renewable-energy (accessed February 28, 2023). 45. Ibid. 46. See note 41, supra. 47. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 19, 23, 43, and 49. 48. See U.S. Department of Energy, Grid Deployment Office, “About Us,” https://www.energy.gov/gdo/about-us (accessed February 13, 2023). 49. U.S. Department of Energy, Grid Deployment Office, “Building a Better Grid Initiative,” https://www.energy. gov/gdo/building-better-grid-initiative (accessed February 13, 2023). 50. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 2, 19, 21, 23, and 84. “The FY 2023 Budget Request to Congress proposes to split the Electricity appropriation account into two accounts: Electricity and Grid Deployment Office (GDO). Had the proposed FY 2023 structure been in place in FY 2021 and FY 2022, the $7,000,000 shown under the Electricity account’s Transmission Permitting and Technical Assistance (TPTA) program would have appeared under Grid Technical Assistance in GDO and the $3,000,000 shown under Program Direction in the Electricity account represents the estimated share of Electricity PD funding associated with TPTA and would have appeared under Program Direction in GDO.” Ibid., p. 84, note. 51. U.S. Department of Energy, Office of Clean Energy Demonstrations, “About Us: Our Mission,” https://www. energy.gov/oced/about-us (accessed February 13, 2023). 52. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, p. 6. 53. U.S. Department of Energy, Office of Clean Energy Demonstrations, “About Us: Our Story,” https://www. energy.gov/oced/about-us (accessed February 28, 2023). 54. U.S. Department of Energy, Office of Clean Energy Demonstrations, “OCED Project Portfolio,” https://www. energy.gov/oced/office-clean-energy-demonstrations (accessed February 28, 2023). 55. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Volume 3, Cybersecurity, Energy Security, and Emergency Response, Federal Energy Management Program, Grid Deployment Office, Indian Energy Policy & Programs, Loan Programs, Manufacturing & Energy Supply Chains, Office of Clean Energy Demonstrations, Petroleum Reserves, Power Marketing Administrations, State and Community Energy Programs, April 2022, p. 104, https://www.energy. gov/sites/default/files/2022-09/doe-fy2023-budget-volume-3-v2.pdf (accessed February 13, 2023). 56. See, for example, ibid., pp. 104 and 107. 57. U.S. Department of Energy, Loan Program Office, “LPO Year in Review 2022: New Legislation,” January 5, 2023, https://www.energy.gov/lpo/articles/lpo-year-review-2022 (accessed February 28, 2023). Emphases in original. 58. H.R. 6256, To Ensure That Goods Made with Forced Labor in the Xinjiang Uyghur Autonomous Region of the People’s Republic of China Do Not Enter the United States Market, and for Other Purposes, Public Law No. 117-78, 117th Congress, December 23, 2021, https://www.congress.gov/117/plaws/publ78/PLAW-117publ78.pdf (accessed February 28, 2023). 59. H.R. 2272, America COMPETES Act, Public Law 110–69, 110th Congress, August 9, 2007, § 5012, https://www. congress.gov/110/plaws/publ69/PLAW-110publ69.pdf (accessed February 13, 2023). 60. Ibid., § 5012(c)(1). 61. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, March 2022, p. 103.
AI Analysis:
"The bill aligns strongly with Project 2025's focus on modernizing the U.S. power grid through advanced technologies like AI and HPC to improve reliability, efficiency, and resilience, particularly in addressing challenges from renewable integration and extreme weather. Both emphasize overcoming regulatory and technical barriers to deploy innovative grid solutions."
— 414 — Mandate for Leadership: The Conservative Promise 81. U.S. Department of Energy, Office of Technology Transitions, “About Us: Mission,” https://www.energy.gov/ technologytransitions/mission-0 (accessed February 13, 2023). 82. Advanced Scientific Computing Research (ASCR); Basic Energy Sciences (BES); Biological and Environmental Research (BER); Fusion Energy Sciences (FES); High-Energy Physics (HEP); Nuclear Physics (NP); Isotope R&D and Production (IRP); and Accelerator R&D and Production (ARDAP). U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Volume 5, Science, April 2022, pp. 10–14, https://www.energy.gov/sites/default/files/2022-05/doe-fy2023-budget-volume-5- science-v2.pdf (accessed March 1, 2023). 83. For example, the CHIPS and Science Act authorizes $50 billion for the Office of Science. U.S. Department of Energy, “Statement by Secretary Granholm on Congressional Passage of the CHIPS and Science Act,” July 28, 2022, https://www.energy.gov/articles/statement-secretary-granholm-congressional-passage-chips-and- science-act (accessed February 13, 2023). 84. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Volume 5, Science, April 2022, p. 7, https://www.energy.gov/sites/default/files/2022-05/doe- fy2023-budget-volume-5-science-v2.pdf (accessed March 2, 2023). 85. U.S. Department of Energy, Office of Environmental Management, “Mission,” https://www.energy.gov/em/ mission (accessed March 1, 2023). 86. U.S. Department of Energy, Office of Environmental Management, “Cleanup Sites,” https://www.energy.gov/ em/cleanup-sites (accessed March 1, 2023). 87. U.S. Government Accountability Office, “DOE’s Environmental Liability,” GAO-21-585R, June 2021, p. 2, https:// www.gao.gov/assets/gao-21-585r.pdf (accessed March 13, 2023). 88. Chart, “EM’s Annual Spending and Estimated Environmental Liability (Fiscal Years 2011–2020),” in ibid., p. 1. 89. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Volume 6, Environmental Management, April 2022, p. 53, https://www.energy.gov/sites/ default/files/2022-09/doe-fy2023-budget-volume-6-em-v3.pdf (accessed March 1, 2023). 90. Ibid. 91. U.S. Government Accountability Office, Nuclear Waste: DOE Needs Greater Leadership Stability and Commitment to Accomplish Cleanup Mission, GAO-22-104805, https://www.gao.gov/assets/gao-22-104805. pdf#:~:text=DOE%20Needs%20Greater%20Leadership%20Stability%20and%20Commitment%20to,May%20 2022%20GAO-22-104805%20United%20States%20Government%20Accountability%20Office May 2022, (accessed February 14, 2023). 92. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 23 and 93. 93. H.R. 3809, Nuclear Waste Policy Act of 1982, Public Law No. 97-425, Title I, Subtitle B. 94. Ibid., Title III, § 304. 95. See, for example, Chapter 4, “The Need for Geologic Disposal,” in Blue Ribbon Commission on America’s Nuclear Future, Report to the Secretary of Energy, January 2012, pp. 27–31, https://www.energy.gov/sites/ default/files/2013/04/f0/brc_finalreport_jan2012.pdf (accessed February 14, 2023). 96. Press release, “DOE Announces $16 Million to Support Consent-Based Siting for Spent Nuclear Fuel,” U.S. Department of Energy, September 20, 2022, https://www.energy.gov/articles/doe-announces-16-million- support-consent-based-siting-spent-nuclear-fuel (accessed February 14, 2023). 97. U.S. Department of Energy, Agency Financial Report, Fiscal Year 2022, DOE/CF-0191, p. 58, https://www. energy.gov/sites/default/files/2022-11/fy-2022-doe-agency-financial-report.pdf (accessed March 13, 2023). 98. H.R. 3809, Nuclear Waste Policy Act of 1982, Public Law No. 97-425, Title III, § 302. 99. Ibid., p. 57. 100. Table, “Department of Energy Comparative Organization by Congressional Control, FY 2023,” p. 5, in U.S. Department of Energy, Office of the Chief Financial Officer, “FY 2023 Budget Justification: Summary Budget Documents,” https://www.energy.gov/cfo/articles/fy-2023-budget-justification (accessed March 13, 2023). 101. U.S. Department of Energy, National Nuclear Security Administration, “Missions,” https://www.energy.gov/ nnsa/missions#:~:text=NNSA%20ensures%20the%20United%20States%20maintains%20a%20safe%2C,of%20 nuclear%20and%20radiological%20terrorism%20around%20the%20world (accessed March 2, 2023). — 415 — Department of Energy and Related Commissions 102. S. 1059, National Defense Authorization Act for Fiscal Year 2000, Public Law 106-65, 106th Congress, October 5, 1999, §§ 3201–3299, https://www.congress.gov/106/plaws/publ65/PLAW-106publ65.pdf (accessed February 14, 2023). 103. See Geller, “U.S. Nuclear Weapons.” 104. U.S. Department of Defense, 2022 National Defense Strategy of the United States of America, Including the 2022 Nuclear Posture Review and the 2022 Missile Defense Review, pp. 3 and 20, https://media.defense. gov/2022/Oct/27/2003103845/-1/-1/1/2022-NATIONAL-DEFENSE-STRATEGY-NPR-MDR.PDF (accessed March 2, 2023). 105. U.S. Department of Energy, National Nuclear Security Administration, “Plutonium Pit Production,” https:// www.energy.gov/nnsa/plutonium-pit-production (accessed March 13, 2023). 106. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, p. 27. 107. 16 U.S. Code § 824o, https://www.law.cornell.edu/uscode/text/16/824o (accessed March 2, 2023). 108. 16 U.S. Code § 824o-1, https://www.law.cornell.edu/uscode/text/16/824o-1 (accessed March 2, 2023). 109. For example, the California blackouts in August 2020 and the Texas blackouts and deaths in February 2021. 110. North American Electric Reliability Corporation, “Announcement: Extreme Weather Heightens Reliability Risks This Summer,” May 18, 2022, https://www.nerc.com/news/Headlines%20DL/May%2018%202022%20SRA%20 Announcement.pdf (accessed February 14, 2023). 111. Ethan Howland, “ISO-NE, ERCOT, MISO Face Possible Capacity Shortfalls in Extreme Winter Weather: FERC,” Utility Dive, October 21, 2022, https://www.utilitydive.com/news/FERC-iso-ne-ercot-miso-extreme-winter- weather-report/634682/ (accessed February 14, 2023), and North American Energy Reliability Corporation, “Announcement: NERC Warns Generation Resources Tight in Large Portion of North America This Winter,” November 17, 2022, https://www.nerc.com/news/Headlines%20DL/2022%20WRA%20Release%20final.pdf (accessed February 14, 2023). 112. Note that the challenges to the grid are coming mainly from subsidized renewable resources. Renewable resources have beneficial attributes, and the electric grid can benefit from embracing an all-of-the-above approach to power generation. 113. See U.S. Department of Energy, U.S. Energy Information Administration, “Glossary: Reserve Margin,” https:// www.eia.gov/tools/glossary/index.php?id=reserve_margin (accessed February 14, 2023). 114. Dan Frosch and Ginger Adams Otis, “North Carolina Power Outage Leaves 33,000 Without Electricity After Substation Attack,” The Wall Street Journal, December 5, 2022, https://www.wsj.com/articles/ attack-on-north-carolina-power-substations-leaves-45-000-without-electricity-11670200585 (accessed February 14, 2023). 115. U.S. Department of Energy, Federal Energy Regulatory Commission, “Power Sales and Markets: RTOs and ISOs,” last updated May 3, 2022, https://www.ferc.gov/power-sales-and-markets/rtos-and-isos (accessed February 14, 2023). 116. Such as the blackouts and shortages in California (August 2020, summer 2022) and Texas (February 2021, summer 2022). 117. See notes 110 and 111, supra; North American Electric Reliability Corporation, “2022 Summer Reliability Assessment,” May 2022, https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_ SRA_2022.pdf (accessed March 13, 2023); and North American Electric Reliability Corporation, “2022–2023 Winter Reliability Assessment,” November 2022, https://www.nerc.com/pa/RAPA/ra/Reliability%20 Assessments%20DL/NERC_WRA_2022.pdf (accessed March 13, 2023). 118. U.S. Department of Energy, Federal Energy Regulatory Commission, “Building for the Future Through Electric Regional Transmission Planning and Cost Allocation and Generator Interconnection,” Notice of Proposed Rulemaking, Federal Register, Vol. 87, No. 86 (May 4, 2022), pp. 26504–26611, https://www.govinfo.gov/ content/pkg/FR-2022-05-04/pdf/2022-08973.pdf (accessed February 14, 2023), and U.S. Department of Energy, Federal Energy Regulatory Commission, “Improvements to Generator Interconnection Procedures and Agreements,” Notice of Proposed Rulemaking, Federal Register, Vol. 87, No. 127 (July 5, 2022), pp. 39934–40032, https://www.govinfo.gov/content/pkg/FR-2022-07-05/pdf/2022-13470.pdf (accessed February 14, 2023).
AI Analysis:
"The bill focuses on using AI and HPC to improve grid efficiency and reliability, which aligns with Project 2025's broader goals of enhancing grid resilience and addressing reliability challenges, though it does not directly address specific Project 2025 proposals like reforming reserve margins, limiting subsidized renewables, or expanding natural gas infrastructure."
— 401 — Department of Energy and Related Commissions nation in the summer110 and winter.111 Cyber and physical attacks also threaten the grid. Specific areas for reform include the following: l Limit the impact of subsidized renewables on price formation. Subsidized renewable resources are undermining electric reliability in RTOs. The increase in subsidized, intermittent resources is undermining the ability of RTOs’ pricing models to support the reliable dispatchable generation that is needed to serve the grid at all times.112 l Reform the application of reserve margins. Reserve margins have become largely meaningless. Traditionally, the electric industry has used “reserve margins” to ensure that the grid has enough power plants to guarantee reliability. Generally, reserve margins represent the amount of generation available (power plants) to meet peak electric demand (the time of day and year when people are using the most electricity) plus a percentage of additional generation for backup.113 However, given the increasing number of intermittent resources (like solar, which may be available during the heat of the day but disappears as the sun sets), other dispatchable generation needs to be available to meet customers’ electricity requirements. Therefore, the definitions and calculations of reserve margins and peak load need to be updated to focus on the modern grid’s reliability challenges for all times of the day and year. l Recognize the interdependence of electric generation and natural gas. The interdependence of electric generation and natural gas pipelines continues to grow. Given natural gas’s important role in generating electricity, especially as backup when renewables are not available, lack of natural gas pipelines or attacks on existing pipelines could threaten our ability to generate electricity. l Expand resource diversity and reliability. Resource diversity is needed to support grid reliability. Pressure to use 100 percent renewables or non– carbon emitting resources threatens the electric grid’s reliability. A grid that has access to dispatchable resources such as coal, nuclear, and natural gas for generating power is inherently more reliable and resilient. l Protect against cyber and physical attacks. The threat of cyber and physical attacks on electric infrastructure by foreign actors like China, Russia, North Korea, and Iran, as well as terrorists, continues to grow. The attacks with guns on substations in North Carolina in December 2022 that left customers without power demonstrate the grid’s vulnerability.114 — 402 — Mandate for Leadership: The Conservative Promise New Policies l Reform RTOs to require reliability. FERC should direct RTOs to establish reliability pricing for eligible dispatchable generation resources or require intermittent resources to procure backup power for times when they are not available to operate. In addition, Congress should repeal subsidies for generation resources. l Update the definition and calculation of reserve margins to support reliability. FERC, NERC, and DOE should revise the definition of reserve margins to ensure the grid’s reliability throughout the day and the year. This will mean recognizing that reserve margins may need to consider “net peak” and exclude non-dispatchable resources from inclusion in reserve margin calculations. l Expand and protect natural gas infrastructure in support of electric generation. FERC needs to ensure that its consideration of natural gas pipeline applications recognizes the role that natural gas plays in electric reliability. FERC also needs to make sure that RTO pricing mechanisms support generators that need to contract for natural gas service on a firm basis. l Support resource diversity and reliability. FERC, NERC, and DOE play key roles in balancing consumer, industrial, and national defense interests to ensure an ongoing reliable, plentiful, and accessible national electricity supply. NERC reliability reviews and FERC’s reliability roles should be aware that overreliance on any one power generation fuel source entails concurrent cost and availability risk. FERC should reform market rules that unduly discriminate against dispatchable resources needed for reliability. l Strengthen security against cyber and physical threats. FERC and NERC need to enhance the security of the bulk power system by, for example, banning Chinese-made components, investing in transformers, and hardening substations and other critical infrastructure. DOE should play a leading role in identifying and addressing threats to the grid. FERC: RTOS/ISOS AND “ELECTRIC POWER MARKETS” Mission/Overview For more than 20 years, FERC has issued regulations and directed policies for the creation and operation of regional transmission organizations (RTOs) and independent system operators (ISOs) to manage the dispatch of generation and
Showing 3 of 5 policy matches
Policy matches are calculated using a hybrid approach: initial candidates are found using semantic similarity between bill summaries and Project 2025 policy text, then an AI model (Llama 3.1 70B) provides detailed alignment ratings and analysis. Ratings range from 1 (minimal alignment) to 5 (very strong alignment). This analysis does not imply direct causation or intent.